Redland Addition

Septic System

Architectural Plans

Approved architectural & engineering plans

Building Codes

Insulation

Insulation R-value requirements

Electrical

Panel & Circuit Plan

Actual expected usage

Amperage across all new circuits if all expected loads were turned on at once.

Circuit Expected usage (amps)
Bedroom 1 receptacles 3.5
Bedroom 2 + Basement Hall + Basement Hall Closet receptacles 3.5
Master Bedroom + Master Closet + Master Hall receptacles 3.5
Lighting for BR 1/BR 2/Master BR/Basement closet/Basement hall/Master hall/Master closet 1.5
Master bathroom receptacles 12.5
Master bathroom lighting/exhaust 3
Master closet washing machine receptacle 11
Master tub circulation receptacle 9
Master tub heater receptacle 12.5
Heat pump circuit 23
Total

2023 Codes

Required number of branch circuits

AFCI

Circuit conductor sizing

Circuit conductor sizing

Permissible loads

15 and 20 amp circuits

Branch circuit requirements summary

Summary table by conductor material and circuit rating

Receptacle Outlets

HVAC

Routing lines

Holes for mechanical

Allowable holes in LVL rim joist

Space for eight lines

Separate upstairs and downstairs exits?

Electrical

OESC 2023 determination regarding disconnect for indoor units in a zonal split system. The lockable disconnect outdoors is sufficient for the indoor units.

Flare fittings

Plumbing

Toilet

Central Vacuum

Bathroom Design

Tubs

Shower Trim